Cracked nozzle weld on pressure vessel leaks gas

Persona

Technologies

Reference number
5263

Location: Dawson Creek

Summary: Nozzle weld failure on first stage suction scrubber (a vertical pressure vessel) remote industrial gas facility results in gas leak through weld. Gas detection within the building alerted operator and compressor was shut down and depressurized.

Attachment Size
5263-644013-1021939.pdf 166.96 KB