Ammonia release results in facility evacuation and temporary shutdown

Incident Investigation

Ammonia release results in facility evacuation and temporary shutdown

July 23, 2019

Boiler, PV and Refrigeration

Reference Number:

II-765453-2019 (#9425)



An ammonia release occurred in the mezzanine area at an industrial food processing facility, which resulted in the evacuation of the facility and temporary shutdown of the ammonia plant.