Upcoming Fee Changes

New fee schedule effective January 1, 2024.  

Upcoming Fee Changes

New fee schedule effective January 1, 2024.  

Electrical fault created within residential load center

Incident Investigation

Electrical fault created within residential load center

August 14, 2020

Electrical

Reference Number:

II-1052002-2020 (#19022)



Location: Penticton

Regulated industry sector: Electrical - Low voltage electrical system (30V to 750V)

Incident overview

An electrical fault was created within a residential load center. When the Utility Cut Out switch activated, a power loss occurred for the surrounding downtown area.

 

Attachment
Size
1195.68 KB