Design Registration

We are experiencing delays in processing design registration applications, including expedited services, due to capacity constraints and a significantly higher than normal volume of applications.  

Design Registration

We are experiencing delays in processing design registration applications, including expedited services, due to capacity constraints and a significantly higher than normal volume of applications.  

Pressure vessel separator incident at plant facility

Incident Investigation

Pressure vessel separator incident at plant facility

May 17, 2017

Boiler, PV and Refrigeration

Reference Number:

5616081



Date: May 17, 2017
Location: Peace River Region, BC

Incident overview: A pressure vessel separator was involved in this event. The plant facility received an alarm from its fire detection system; and a loss of containment of process involving a fire occurred.

Attachment
Size
2654.81 KB