Waste Heat Recovery Unit Diverter Failure Leads to Temperature Spikes and Leaks During Startup

Incident Investigation

Waste Heat Recovery Unit Diverter Failure Leads to Temperature Spikes and Leaks During Startup

December 4, 2023

Boiler, PV and Refrigeration

Reference Number:

II-1649690-2023 (#42097)



Location: Northeastern BC

Regulated industry sector: Boilers, PV & Refrigeration - Boiler and pressure vessel system

Incident overview

During the operation of a waste heat recovery unit, a diverter valve stuck open, causing a temperature spike and triggering the high temperature alarm. At the same time, a second heater in the series developed a leak in its heat medium coil due to a cracked weld.