Elevating Devices Inspection Booking

Assessments

Elevating Devices Inspection Booking Procedure

New and Altered Devices

To book a physical assessment (inspection) for your elevating device, please have your elevating devices contractor contact the safety officer assigned to your area and submit the applicable forms.

Forms By Inspection Type

Form nameTime to submit to safety officerFrequency

Request for Acceptance Inspection 1148

After safety officer confirms dateEach inspection request

General contractor’s pre-inspection checklist

*Includes BC P.Engineer Documentation as per checklist*

Prior to start of inspection

*Not required if submitted for Construction Use 5.10 inspection*

Once, unless inspection fails and requires re-submission

Examination & Testing Declaration 1717

Prior to start of inspectionOnce

Data sheet checklist

Prior to start of inspection/prior to start of re-inspection when applicable



Once, unless inspection fails and requires new values on checklist

In this case, revised data checklist to be submitted prior to start of re-inspection

Form nameTime to submit to safety officerFrequency

Request for Acceptance Inspection 1148

After safety officer confirms dateEach inspection request

General contractor’s pre-inspection checklist

*Includes BC P.Engineer Documentation as per checklist*

Prior to start of inspectionOnce, unless inspection fails and requires re-submission

Examination & Testing Declaration 1717

Prior to start of inspectionOnce

Data sheet checklist

Prior to start of inspection/prior to start of re-inspection when applicable

Once, unless inspection fails and requires new values on checklist

In this case, revised data checklist to be submitted prior to start of re-inspection

Form nameTime to submit to safety officerFrequency

Request for Acceptance Inspection 1148

After safety officer confirms date

Each inspection request



Examination & Testing Declaration 1717

Prior to start of inspectionOnce

Data sheet checklist

Prior to start of inspection/prior to start of re-inspection when applicable



Once, unless inspection fails and requires new values on checklist

In this case, revised data checklist to be submitted prior to start of re-inspection

Form nameTime to submit to a safety officerFrequency

Request for Acceptance Inspection 1148

After safety officer confirms dateEach inspection request

Examination & Testing Declaration 1717

Prior to start of inspectionOnce

Data sheet checklist

Prior to start of inspection/prior to start of re-inspection when applicable

Once, unless inspection fails and requires new values on checklist

In this case, revised data checklist to be submitted prior to start of re-inspection

 

Form nameTime to submit to safety officerFrequency

Request for Acceptance Inspection 1148

After safety officer confirms date

Refer to alteration List for inspection requirements

Form to be submitted to safety officer within 60 days of returning device to service

Examination & Testing Declaration 1717

Within 30 days of completion of work

Once, within 30 days of completion of work

*Declaration required with or without inspection*

Form nameTime to submit to safety officerFrequency

Request for Acceptance Inspection 1148

After safety officer confirms dateEach inspection request

Examination & Testing Declaration 1717

Prior to start of inspectionOnce

Construction Hoist Data Sheet Form 1720

Prior to start of inspection/prior to start of re-inspection when applicable



Once, unless inspection fails and requires new values on checklist

In this case, revised data checklist to be submitted prior to start of re-inspection

Form nameTime to submit to safety officerFrequency

Request for Acceptance Inspection 1148

After safety officer confirms dateEach inspection request

Examination & Testing Declaration 1717

Prior to start of inspectionOnce
Form nameTime to submit to safety officerFrequency

Request for Acceptance Inspection 1148

After safety officer confirms dateEach inspection request

Examination & Testing Declaration 1717

Prior to start of inspectionOnce

Construction Hoist Data Sheet Form 1720

Prior to start of inspection/prior to start of re-inspection when applicable

Once, unless inspection fails and requires new values on checklist

In this case, revised data checklist to be submitted prior to start of re-inspection



Failure to Submit Applicable Forms

Please note: failure to submit the applicable forms or submission of incomplete forms may result in the inspection being failed.

The contractor is responsible for ensuring that all the testing equipment used to demonstrate compliance during the acceptance test is available on site.

Non-compliances issued prior to a final acceptance inspection must be declared before requesting a final acceptance.

About Failed Inspections

Your inspection may be failed if testing equipment is unavailable to demonstrate compliance during an acceptance test. It is the responsibility of the contractor to ensure the appropriate testing equipment is available during the inspection.

Similarly, inspections may not pass if repairs or corrections cannot be completed within a reasonable time frame, at safety officer discretion. The repair or correction will be noted on the Certificate of Inspection.

Non-compliances include a high hazard condition.

Failed inspections will result in the need for a re-inspection, which have a minimum two-week wait for re-inspection. Any applicable travel costs (mileage, travel time, accommodation, meals), will be billed to subsequent re-inspections in addition to the re-inspection fee(s).

Non-compliances related to a failed inspection must be corrected and declared prior to requesting a re-inspection.

The same procedure for booking an inspection should be followed to book a re-inspection.

Cancellations must be received at least two full business days* before your scheduled inspection and should be made directly to the safety officer. Cancellations outside of this timeframe will be considered a failed inspection and full inspection fees, including applicable travel costs (e.g., travel time, accommodation, flights, meals, car rental) will apply. Any costs related to booked airfare and accommodations will be charged regardless of when notice was given.

E.g., an inspection is booked for Friday; the safety officer must be notified of the cancellation no later than the Tuesday prior. Business days are exclusive of statutory holidays.

Booking after any cancellation may result in a minimum one-week wait time.

If you are requesting an overtime inspection, the request for overtime inspection form must be submitted.

In addition to inspection time, overtime hour billing may include administrative and travel time.

A request to remove a unit to service does not incur additional cost.

A request to return a unit from service may be billed a minimum of two hours, see “special inspection” under the fee schedule.

For general questions, please contact the safety officer assigned to your area.

If you are not able to connect with a safety officer, please email elevating@technicalsafetybc.ca.

For design registration and to follow up on permit submissions, please email EIM@technicalsafetybc.ca.

Find an Elevating Device Safety Officer by Area

NamePhoneEmailArea Assignments
Brian Bligh778 868 3743Brian.Bligh@technicalsafetybc.ca
  • Abbotsford
  • Chilliwack
  • Hope
  • Langley
  • Lower Mainland
  • Mission

Nick Kim

604 735 1559 Nick.Kim@technicalsafetybc.ca
  • Lower Mainland (South of the Fraser River)
    Personnel Hoist Remote Extensions
Igor Olendzskiy604 619 4368Igor.Olendzskiy@technicalsafetybc.ca
  • Lower Mainland (North of the Fraser River)
    Personnel Hoist Remote Extensions
Shoeeb Mohammed604 831 1127Shoeeb.Mohammed@technicalsafetybc.ca
  • Burnaby 1
TJ Sanchez604 787 4424TJ.Sanchez@technicalsafetybc.ca
  • Coquitlam
  • New Westminster
  • Port Coquitlam
  • Port Moody
Samer Aabedi778 873 3132Samer.Aabedi@technicalsafetybc.ca
  • Delta
  • Richmond
  • Tsawwassen
Leonel Castillo236 996 6716Leonel.Castillo@technicalsafetybc.ca
  • Downtown Vancouver (Central / East - (Thurlow to Main St) 2
  • Sunshine Coast
  • Squamish
  • Whistler
John Rudyak604 338 5341John.Rudyak@technicalsafetybc.ca
  • Downtown Vancouver (West of Thurlow) 3
  • North Vancouver
  • Maple Ridge
  • Pitt Meadows
  • West Vancouver
Tony Barta604 754 9017Tony.Barta@technicalsafetybc.ca
  • East Vancouver (Main Street to Boundary Road) 4

    Note – Due to extended leave, contact Field Services Leader don.mcgregor@technicalsafetybc.ca
Steven Mark778 877 3067Steven.Mark@technicalsafetybc.ca
  • Surrey
  • White Rock
Glen Quan604 209 0903Glen.Quan@technicalsafetybc.ca
  • Skytrain
  • Vancouver West (UBC to Main St) 5

 



1 See Area 108
2 See Area 101 / 103
3 See Area 102
4 See Area 104
5 See Area 105

NamePhoneEmailArea Assignments
Dereck Carter250 877 3412Dereck.Carter@technicalsafetybc.ca
  • Greater Victoria (including Esquimalt, Langford, Colwood, Sooke, Sidney)
  • Victoria Downtown
Ken Nielsen778 867 1348Ken.Nielsen@technicalsafetybc.ca
  • North Island (including Nanaimo, Duncan, Mill Bay)

 

NamePhoneEmailArea Assignments
Corey Klein672 969 1951Corey.Klein@technicalsafetybc.ca
  • Downtown Kelowna 1, 2
  • Interior South (includes West Kelowna, Penticton, Princeton, Merritt, Cranbrook) 1
Glenn Brown250 878 8238Glenn.Brown@technicalsafetybc.ca
  • Interior North (includes Salmon Arm, Revelstoke, Princeton, Merritt, Golden) 1
  • Kelowna 1, 3
Jeff LaCombe250 371 7625Jeff.LaCombe@technicalsafetybc.ca
  • Kamloops to Prince George (includes Lillooet, Cache Creek, Bella Coola) 1

 



1 Requires a minimum of 5 business days’ notice for inspection requests, inspections may not be booked more than three weeks in advance unless otherwise confirmed with the safety officer
2 See Area 106
3 See Area 107

Area Assignments

Related Information

Directive

Directive: Correction of Non-Compliances for Elevating Devices

This Directive specifies the applicable form(s) and/or method to notify Technical Safety BC when non-compliances are corrected.

Learn More
Elevating Devices Forms

Request for Overtime Inspection

To request an overtime inspection, complete and submit the Request for Overtime Inspection Form for pre-approval.